Connect with us

News

$29.9Bn Loan: DMO Backs Presidency, Stresses Need for Infrastructure

Published

on

Dr. Abraham Nwankwo, director general of the Debt Management Office (DMO)
Kindly share this post

Dr. Abraham Nwankwo, director general of the Debt Management Office (DMO) on Tuesday provided clarifications on the proposed $29.9bn foreign loans request submitted to the National Assembly by President Muhammadu Buhari recently.

Although the Senate voted against the proposed loan at its sitting on Tuesday, the DG, while speaking on a Channels TV live programme, explained that the loans, which cover a period of three years, would help in addressing the biting infrastructure deficit in the country.

He stated, “When you are in this kind of economic situation, you have to decide where you want to start addressing the problem. You then come to the conclusion that the most critical point to start is to deal with infrastructure problem. If you deal with infrastructure problem, the cost of power will be lower, the cost of transportation will be lower, and the cost of most other services will be lower.”
 
According to him, one of the features of the proposed loan is the low concessionary nature of the interest rate, which starts 1.5%. This arrangement differs from previous loan arrangements (under previous administrations) with the Paris Club of creditors, which came with floating interest rates as high as 18 per cent.

He also explained that the facility will help revive infrastructure like railways which will smoothen movement of heavy goods across the country.

He believed tackling infrastructure deficit would force down costs of goods and services on the long run, explaining that the development will have a significant impact on the price level in the economy. “That impacts the economy by bringing down the general price level, (they call it the consumer price index, which is a classical measure of the price level and the rate of inflation.) When you do this, the Central Bank of Nigeria will set the monetary policy rate low, because all over the world, the central bank knows it has to put the monetary policy rate high enough to catch up with inflation rate, otherwise we will be talking of negative real rate of interest which destroys the economy. So the way to go about it is that you have adequate infrastructure, power road, transportation ICT. All these make the cost of production in the economy much lower and when this happens, the cost of goods and services will be lower and then inflation will start coming down. And if inflation comes down, the monetary policy rate will be lower and this will translate to a lower lending rate. That is the sequence,” Nwankwo explained.

The DG stated that the $30bn is actually for a three year-period and that it will run from 2016-2018 to be repaid in 20-30 years time. He said, with this arrangement, it will not be difficult for the country to repay.

According to him the DMO had advised the Federal Government that Nigeria can as from 2017 acquire loans to the tune of $22bn and that $30bn(for three years) is lower than what it advised the Federal Government to get.

Speaking on how the $30bn will be spent, Nwankwo stated that the sum of $10bn will be spent per annum for three years and will be targeted at building infrastructure in all states of the federation and the main focus will be on power generation, rail and road renovation and construction.


Kindly share this post

Nigeria CommunicationsWeek believes that technology makes life more exciting and helps improve the lives of people around Nigeria and indeed the world. So since 2007, we have devoted our energy to independent reportage of technology and how they affect lives.

Continue Reading
Advertisement
Comments

News

Nigeria, Others Lag Behind as Egypt Tops Africa in AI Readiness

Published

on

Kindly share this post

Nigeria and other Sub-Saharan Africa countries rank ninth out of nine global regions as Egypt has emerged as Africa’s leading country in artificial intelligence readiness, ranking first on the continent and 51st globally in the 2025 Government AI Readiness Index published by Oxford Insights.

The impressive ranking has been lauded as underscoring North Africa’s growing influence in the global AI race.

According to Egypt’s Ministry of Communications and Information Technology (MCIT), the country scored 57.5 points out of 100, climbing 14 places from 65th in 2024.

The Nile nation also ranked fourth in the Middle East and North Africa (MENA) region, behind Saudi Arabia, Israel and the United Arab Emirates.

The Oxford Insights index assesses 195 governments using 69 indicators across six pillars, including policy capacity, governance, AI infrastructure, public sector adoption, development and diffusion, and resilience.

Egypt topped the Policy Capacity pillar globally with a perfect score of 100, tying with the UK, Serbia and Australia, an indicator of strong national AI policymaking and institutional readiness.

Oxford Insights noted that countries such as Egypt are “expanding the use of AI across national priorities while shaping policies to strengthen domestic AI ecosystems,” although gaps in infrastructure and talent development remain in some contexts.

MCIT minister Amr Talaat attributed Egypt’s strong performance to deliberate government action.

“This achievement reflects our efforts to integrate artificial intelligence into public services and accelerate digital transformation through Egypt’s second National AI Strategy. We are positioning Egypt as a regional AI hub while ensuring AI delivers real economic and social value,” he said.

Launched for 2025–2030, Egypt’s National AI Strategy targets sectors such as healthcare, justice and public administration, while aiming to train 30 000 AI specialists by 2030 and raise AI’s contribution to GDP to 7.7%.

Talaat also highlighted Egypt’s cybersecurity credentials when he highlighted that the country ranked among the top 12 globally in the ITU’s Global Cyber security Index.

Regionally, the results expose sharp contrasts across Africa. Sub-Saharan Africa ranks ninth out of nine global regions, with an average score of 28.04, reflecting persistent gaps in AI infrastructure and public sector adoption.

However, countries such as Kenya, South Africa, Mauritius and Nigeria lead the sub-region, while Rwanda and Ethiopia are gaining momentum through innovation hubs and policy reforms.

In contrast, the MENA region ranks fifth globally, buoyed by significant investment in AI infrastructure and policy capacity, particularly in Gulf states.


Kindly share this post
Continue Reading

News

SERAP Sues INEC Over Alleged ₦55.9Bn Election Funds Diversion

Published

on

Kindly share this post

Socio-Economic Rights and Accountability Project (SERAP) has dragged the Independent National Electoral Commission (INEC) to court over the alleged failure to account for ₦55.9 billion reportedly meant for the procurement of election materials for the 2019 general elections.

SERAP Sues INEC Over Alleged ₦55.9Bn Election Funds Diversion

The grave allegations are documented in the latest annual report published by the Auditor-General on 9 September 2025.

In the suit number FHC/ABJ/CS/38/2026 filed last Friday at the Federal High Court in Abuja, SERAP is seeking: “an order of mandamus to direct and compel INEC to account for the missing or diverted N55.9 billion meant to buy smart card readers, ballot papers, and other election materials for the 2019 general elections.”

SERAP is also seeking: “an order of mandamus to direct and compel INEC to disclose the names of all contractors paid the N55.9 billion for the procurement of smart card readers, ballot papers, result sheets, and other election materials for the 2019 general elections, including the names of their directors and shareholders.”

In the suit, SERAP is arguing that: “INEC must operate without corruption if the commission is to ensure free and fair elections in the country and uphold Nigerians’ right to participation.”

SERAP is also arguing that, “INEC cannot ensure impartial administration of future elections if these allegations are not satisfactorily addressed, perpetrators including the contractors involved are not prosecuted and the proceeds of corruption are not fully recovered.”

According to SERAP, “INEC cannot properly carry out its constitutional and statutory responsibilities to conduct free and fair elections in the country if it continues to fail to uphold the basic principles of transparency, accountability and the rule of law.”

SERAP is also arguing that, “These allegations also constitute abuse of public office and show the urgent need by INEC to commit to transparency, accountability, clean governance and the rule of law.”

SERAP also said, “Allegations of corruption in the supply of smart card readers, ballot papers, result sheets and other election materials directly undermine Nigerians’ right to participate in elections that are free, fair, transparent, and credible.”

The lawsuit filed on behalf of SERAP by its lawyers, Kolawole Oluwadare, Kehinde Oyewumi, and Andrew Nwankwo, read in part: “These grim allegations by the Auditor-General suggest a grave violation of the public trust, the Nigerian Constitution 1999 [as amended] and international anticorruption standards.”

“According to the recently published 2022 audited report by the Auditor General of the Federation (AGF), the Independent National Electoral Commission (INEC) ‘irregularly paid’ over N5.3 billion [N5,312,238,499.39] ‘to a contractor for the supply of Smart Card Readers for the 2019 general elections’.

“The contract was awarded without prior approval from the Bureau of Public Procurement (BPP) and the Federal Executive Council. The payment was also ‘made without any document. There was no evidence of supplies to the commission.’”


Kindly share this post
Continue Reading

News

FG Inaugurates N40Bn CCTV Control Centre for Third Mainland Bridge

Published

on

Kindly share this post

Federal government has inaugurated a ₦40 billion closed-circuit television (CCTV) control centre for the Third Mainland Bridge in Lagos.

FG Inaugurates N40Bn CCTV Control Centre for Third Mainland Bridge

Speaking at the inauguration on Sunday, David Umahi, minister of Works, said the project followed extensive rehabilitation works carried out on the bridge after the current administration took office in 2023.

“When we came on board in 2023, we met a very terrible Third Mainland Bridge,” Umahi said, adding that the structure, along with Carter and Iddo bridges, required comprehensive re-evaluation and repairs both above and below water level.

He said President Bola Tinubu approved the total rehabilitation of the bridge, including replacement of expansion joints, noting that the completed work had improved driving conditions and extended the bridge’s lifespan.

Umahi said the CCTV system, first announced in 2025, was designed to curb dangerous driving, prevent suicide attempts and strengthen security.

He added that security personnel would monitor live footage from the control centre and enforce speed limits on the bridge.

The minister commended the China Civil Engineering Construction Corporation (CCECC), which executed the project, for what he described as high-quality delivery. He said the contract also included a surveillance boat and two Hilux vans, which would be handed over to the police to support monitoring and rapid response.

“The idea is that we can see everything that is happening on the bridge,” Umahi said, expressing concern over excessive speeding and urging motorists to comply with traffic regulations.

Earlier, Olufemi Dare, federal controller of works in Lagos, said the facility was the first of its kind on any bridge in Nigeria.

He said the system allows real-time monitoring of activities on the bridge and surrounding waters.

Dare said the project includes 240 solar panels, 10 inverters, a 300 KVA transformer, a standby generator, multiple monitoring screens and full air-conditioning for the control centre.

He added that the contract also covers 1,268 solar-powered street lights and a borehole facility.

According to Dare, the project was awarded at a cost of ₦40.17 billion, with about ₦36 billion paid so far to the contractor. He said the current inauguration marked the first phase, with additional commissioning planned once work on the bridge’s extension is completed.

He thanked the president for approving the project and praised Umahi for ensuring due process during its execution.


Kindly share this post
Continue Reading

Trending