Connect with us

General News

SON Pledges to Standardize Made-in-Aba Products

Published

on

Kindly share this post

The Standards Organisation of Nigeria (SON) says it is intensifying efforts to standardise locally manufactured products, including Made-in-Aba brands, in order to enhance both local and international acceptance.

Aharanwa Chuks, Director of Region (South East), SON, communicated this in an interview with the News Agency of Nigeria (NAN) on Wednesday in Abuja.

Chuks said through the Mandatory Conformity Assessment Programme (MANCAP), SON ensured that all Nigerian-made products conformed to the relevant Nigerian Industrial Standards (NIS).

According to him, MANCAP involves direct engagement with manufacturers to certify that their products meet established quality benchmarks.

“This process includes inspecting production facilities, sampling products and testing them against NIS requirements.

“Successful compliance results in the issuance of the MANCAP certification, signifying adherence to quality standards.

“In Aba, SON has been proactive in educating manufacturers about standardization.’’

The director said SON also conducted stakeholder interactions; gathering manufacturers from various sectors to provide guidance on producing goods that met both local and international standards.

“For instance, leather manufacturers in Aba have been sensitized on standardization practices to enhance the global competitiveness of their products.

“Manufacturers are encouraged to collaborate with SON to obtain MANCAP certification, ensuring their products are not only marketable within Nigeria but also competitive internationally.

“This initiative aims to boost consumer confidence and promote the acceptance of Made-in-Aba products globally,” Chuks said.

 


Kindly share this post

Dear Reader, Your support matters. But we believe that technology makes life more exciting and helps improve the lives of people around Nigeria and indeed the world. That is why, we have devoted our energy to independent reportage of technology and finance and how they affect lives. Our incisive and analytical view of how technology news affects the daily life help individuals and organizations make up their minds. Quality journalism costs money. Today, we're asking that you support us to do more. Kindly support our effort to deliver technology and finance journalism to everyone in the world. Donate as little as N1,000. Bank transfers can be made to: UBA Plc 1017156876 Communication Week Media Ltd

General News

Nigeria Still Paying $36m Yearly for Failed Abuja CCTV Loan- FIJ

Published

on

Kindly share this post

Nigeria is effectively repaying an estimated $36.4 million annually for an Abuja CCTV project that was never fully delivered, with repayments on the Chinese loan expected to run until 2030, according to Foundation for Investigative Journalism (FIJ).

Nigeria Still Paying $36m Yearly for Failed Abuja CCTV Loan- FIJ

The project, officially known as the National Public Security Communication System (NPSCS), was introduced under former president Goodluck Jonathan in 2010 as a major security infrastructure programme for Abuja amid rising bomb attacks and insecurity in the Federal Capital Territory.

The federal government signed a contract valued at about $470 million with ZTE Corporation for the project before securing a $399.5 million loan from China Eximbank to finance most of it.

According to data from AidData, a research lab at the College of William & Mary in the United States that tracks Chinese development finance globally, the loan carries a 20-year maturity period, a seven-year grace period, and a fixed interest rate of 2.5 per cent.

Based on those terms, repayment is expected to continue until approximately 2030.

FIJ cross-referenced these details with the DMO’s documentation of the loan.

In 2021, the DMO published ‘LOANS OBTAINED FROM CHINA EXIM AS AT SEPTEMBER 30, 2021 AMOUNTS IN MILLIONS’, where it stated that the FG had paid back $122 million and an interest of $96 million.

FIJ estimated the yearly repayment using a standard loan repayment formula often used for long-term loans like sovereign debt and mortgages.

The method assumes the loan is repaid in equal yearly instalments over a fixed period. Each payment covers part of the original loan and the interest charged on the remaining balance.

As the debt reduces over time, the interest charged also drops, although the total yearly payment stays the same.

Using this model, FIJ treated the $399.5 million loan as repayable over 13 years at an annual interest rate of 2.5 per cent.

This was after factoring in a seven-year grace period within the loan’s 20-year lifespan.

Based on these assumptions, the estimated yearly repayment came to about $36.4 million.

This estimate is only a simplified projection. In reality, sovereign loans are often repaid under more flexible arrangements.

Sometimes, there could be semi-annual payments, interest added during grace periods, or repayment plans where larger payments come later.

FIJ understands that the debt has also become more expensive in naira terms because the loan is denominated in US dollars.

When the loan agreement was signed in 2010, the naira exchanged at roughly N150 to $1 in the official market, according to the Central Bank of Nigeria. At that rate, the $399.5 million facility was equivalent to around N59.9 billion.

On Monday, however, the dollar traded above N1,370 at the official market.

Using an exchange rate of N1,371/$, the same $399.5 million obligation is now equivalent to about N547.8 billion.

In effect, the naira value of the debt has increased by roughly N487.9 billion since the loan was signed.

This means the debt burden has grown by more than nine times in naira terms in the past 16 years due largely to the depreciation of the naira against the dollar.

Nigeria is effectively repaying about $36.4 million yearly for the Abuja CCTV project under the loan’s repayment structure.

At the current official exchange rate of roughly N1,371 to the dollar, that yearly repayment translates to about N49.9 billion annually.

When the loan was signed in 2010, however, the naira traded at around N150/$, meaning the same yearly repayment would have cost about N5.5 billion at the time.

The CCTV project has remained controversial since the start of the implementation.

The federal government originally presented the project as a modern surveillance and emergency-response system designed to improve security monitoring across Abuja.

The infrastructure was expected to include city-wide CCTV surveillance, emergency communication systems, command-and-control centres and integrated police communication facilities.

But in 2016, members of the House of Representatives Committee on Police Affairs visited the control centre and found that many installed cameras were either inactive or non-functional.

In 2019, the matter resurfaced when lawmakers asked why Nigeria was still repaying the Chinese loan despite concerns about the operational status of the surveillance infrastructure.

During legislative discussions at the time, Zainab Ahmed, then minister of Finance, stated that the government was still servicing the loan but did not have full information regarding the project’s implementation status. Lawmakers brought the issue back to the fore in April due to insecurity in the Federal Capital Territory.

The issue became the subject of litigation after the Socio-Economic Rights and Accountability Project  (SERAP)sued the Federal Government under the Freedom of Information Act, seeking details of the spending and implementation process.

In 2023, Justice Emeka Nwite of the Federal High Court in Abuja ordered the government to disclose information relating to the project, including how the loan was spent and the identities of contractors involved.

On Sunday, the Federal Ministry of Finance had told SERAP, which had urged Taiwo Oyedele to publish details surrounding the project, that, “Records from the Ministry of Police Affairs indicate that while local subcontractors may have been engaged, there is an absence of detailed subcontracting records identifying specific local companies that received funds directly from the Chinese loan.”


Kindly share this post
Continue Reading

General News

FG Cancels $717.7m World Bank Power Loan as Electricity Crisis Deepens

Published

on

Kindly share this post

Federal Government has cancelled $717.7 million in undisbursed World Bank intervention financing designed to revive Nigeria’s struggling electricity sector.

FG Cancels $717.7m World Bank Power Loan as Electricity Crisis Deepens

The cancellation followed a formal request by the Federal Government and a joint decision by both parties to discontinue financing under the Power Sector Recovery Performance-Based Operation due to evolving sector realities and the inability to achieve key reform milestones.

The development followed an earlier warning by the Accountant-General of the Federation, Dr. Shamseldeen Ogunjimi, that Nigeria may reject loan facilities from the Bank if delays in approval and disbursement persist, stating that prolonged timelines could undermine the country’s willingness to proceed with such arrangements.

According to documents obtained from the World Bank, the development effectively terminates the remaining portion of a $1.52 billion power sector recovery programme. The cancelled amount represents the entire undisbursed balance remaining under the programme.

“The restructuring will result in the cancellation of the entire undisbursed balance in the amount of $717.7m equivalent, and no further disbursements will be made under the Program following approval of this restructuring,” the bank stated.

The Federal Government developed the Power Sector Recovery Programme as a framework to restore the sector’s financial viability and reduce its fiscal burden on public finances. The programme included plans to progressively eliminate tariff shortfalls, improve operational performance among power sector institutions, and strengthen regulatory oversight and accountability mechanisms.

The loan was approved on June 23, 2020, with original financing of about $752.5 million equivalent to improve electricity supply reliability, strengthen financial sustainability, and enhance accountability across the electricity value chain. Following initial progress, the World Bank approved an Additional Financing package of approximately $763.5 million equivalent on June 9, 2023, which became effective on June 19, 2024, extending the project’s closing date to June 30, 2027.

However, while the parent programme largely achieved its results and successfully disbursed its resources, the additional financing struggled significantly to meet critical reform conditions. High technical, commercial, and collection losses across the distribution segment, combined with inadequate cost recovery, created a recurring mismatch between revenues generated by the sector and its actual operating costs.

The World Bank noted that Nigeria’s electricity sector continues to face deep-rooted structural challenges despite years of reforms and financial support, citing weak distribution performance, transmission bottlenecks, underutilization of available generation capacity, and persistent financial imbalances.

Implementation of the original operation delivered notable results initially, reducing tariff shortfalls by 71 percent between 2019 and 2022 (declining from ₦581 billion to ₦166 billion), while regulatory cost recovery improved from 56 percent to 94 percent.

The anticipated reforms under the newer additional package failed to materialize due to major macroeconomic developments that dramatically altered the operating environment. The liberalisation of Nigeria’s foreign exchange market in June 2023 triggered a sharp depreciation of the naira, leading to a substantial increase in the cost of natural gas used for electricity generation. More than 70 percent of electricity supplied to Nigeria’s national grid is generated using natural gas, which is priced in United States dollars.


Kindly share this post
Continue Reading

General News

Coscharis Technologies, Huawei Unveil IdeaHub S3 Interactive Board in Nigeria

Published

on

Kindly share this post

Coscharis Technologies Limited, a leading Information Technology distribution company in the Sub-Saharan African market, in collaboration with Huawei, has officially launched the innovative Huawei IdeaHub S3 interactive board into the Nigerian market.

The unveiling ceremony, which attracted top industry stakeholders, partners, and technology enthusiasts, was held at the prestigious Federal Palace Hotel, Lagos, in the heart of Nigeria’s commercial hub.

Speaking at the event, the Managing Director of Coscharis Technologies Limited, Dr. Sunday Mukoro, appreciated guests for attending and reaffirmed the company’s commitment to introducing cutting-edge technologies into the Nigerian market to accelerate the country’s technological advancement.

Dr. Mukoro described the Huawei IdeaHub S3 as a next-generation smart collaboration device equipped with advanced features designed to enhance productivity, communication, and digital collaboration across businesses, educational institutions, and organizations.

To further excite participants at the launch, he announced a special one-off 20 percent discount for early bird orders placed during the event.

Representing Huawei, Charles Chen, Huawei Nigeria eKit Manager, reiterated Huawei’s dedication to delivering world-class technology solutions tailored to modern workplace and learning environments. He emphasized that the IdeaHub S3 reflects Huawei’s continuous innovation in smart office and collaborative technologies.

The Huawei IdeaHub S3 is available in 65-inch, 75-inch, and 86-inch variants and comes loaded with several advanced features, including ergonomic design, ultra-low latency performance, 4K dual-lens camera with 5x zoom capability, and superior image quality with zero colour cast technology.

Other notable features include a 24-microphone array with up to 15-meter sound pickup range, high-fidelity stereo sound system, 4K soft light screen, intelligent tracking with auto-crop view, Acoustic Baffle 2.0 technology, ultrasonic projection, app multiplier functionality, and enhanced BYOM/BYOD collaboration capabilities.

The event climaxed with the formal unveiling of the Huawei IdeaHub S3, led by Dr. Sunday Mukoro alongside executives from Huawei and the Coscharis Huawei team, marking another milestone in the advancement of smart collaborative technology solutions in Nigeria

 


Kindly share this post
Continue Reading

Trending