Connect with us

Telecom

USPF, Stakeholders Seek New ICT Growth Paradigm

Published

on

Kindly share this post

The Universal Service Provision Fund (USPF) was established with a mandate to ‘achieve universal access, universal coverage and universal service through a public-private partnership framework that stimulates economic and social development, private sector investment and market-based provision of basic affordable and quality ICT infrastructure and services to unserved and underserved areas, communities and populations.’

But sadly, the fund since establishment has struggled to meet its basic tenets. However, at a recent stakeholders’ conference in Lagos to preview its Strategic Management Plan – 2013 – 2017, the general consensus was that time has come for a new approach to streamline the Fund with the realities and demands of the ICT market.

Specifically, it was noted that the Fund would henceforth work in tandem with stakeholders and industry operators to give them greater opportunities.

Maikano Abdullahi, secretary of the USPF, agreed in his own words that the Fund had not met its set out goals. He pleaded with stakeholders to give the Fund the benefits of doubt as it was set for a new season of mutual cooperation.

“In the past, there has been this mutual distrust between the operators (especially the major players), and the Fund. Whereas, the Fund expected them (operators) to take what we give them, the operators see things differently. They first look at projects on basis of returns-on-investment. How beneficial would the project be to them economically? I think we have looked at all these issues and we’re ready to dialogue with every player in the industry to ensure full participation,” said Abdullahi.

And to ensure that the new SMP strategy would not be another ‘white Elephant’, Abdullahi said so much work has been included in the new plan which would see an addition of about 3,000 kilometres of fibre and 1000 Base Stations, deployed across Nigeria every year. Admittedly, noted that the last SMP which expired in 2011 had minimal success.

He noted that the last SMP which ran from 2007 to 2011 had targeted provision of 291 community communications centres across the six geo-political zones (which will provide shared access to telephone and internet services in the rural areas).

Sadly, at the close of the period, it ended up providing 224 which represented 77 percent of the target.

It also targeted deployment of 490 base stations which would subsidize the lot that operators have to deploy in rural Nigeria, but it succeeded in awarding subsidies for only 74 BTS which represented just 12 percent of its target.

Consequently, the Fund would now adopt a holistic approach to project selection by determining specific ICT gaps in regional clusters within the country and tailoring its projects and service delivery models to suit identified needs within the clusters. With this approach, the USPF shall ensure that its projects are relevant and appropriate for its beneficiaries,” said Abdullahi.

The new published SMP strategy also emphasized the need for the USPF to actively involve all stakeholder groups in the planning and execution of its programmes and projects in order to effectively address and close Nigeria’s universal access and service gaps.

The aim is to avoid previous operational model collapse due to its one-size-fits-all approach. It is also aimed at arresting operators’ apathy due to perceive non-economic viability by engaging in frank dialogue before a project is awarded, using the cluster-development group model.

It noted that the “USPF’s experience over the past five years and the lessons gleaned from the review of the USP service delivery models in other jurisdictions have indicated that USP projects implemented in rural areas often difficult to sustain doe to high costs associated with operating these projects. In a number of cases, operational costs have been known to outweigh the initial capital outlay required for implementing USP projects. Consequently, the USPF will ensure its subsidies take into consideration operational costs associated with running USP projects over a defined period.

This is expected to provide service providers with a ‘grace’ period within which they will have built up a stable clientele and established demand for the service being provided. The period over which operational support will be granted will be determined based on assessment of the time required for each project to generate revenues capable of meeting its operational costs.”

It also expects to “develop and implement a robust monitoring and evaluation framework which will define the metrics/indicators that would be used to determine effectiveness of UAS programmes and their impact on beneficiary communities. The defined metrics should measure the relative cost and benefits of each programme and must ties back into the overarching objectives of the USPF. “

Abdullahi said “effective monitoring and evaluation of USP projects will facilitate the early detection of potential projects sustainability issues and help to address and rectify these issues early on in the implementation process.”

In arriving at the new SMP, the USPF also took into consideration factors such as Nigeria’s macroeconomic review and outlook, political landscape and outlook and an overview of the country’s telecommunication industry. 

On the Macroeconomic review and outlook, the Fund notes that “Nigeria is a middle income and emerging economy which is predominantly agricultural – agriculture is the single largest contributor to GDP and is estimated to have contributed about 40.24 percent of the GDP in 2011.

However, while agriculture remains the largest employer of labour, petroleum, the leading mineral in Nigeria, is currently the major source of revenue (especially foreign exchange) for the country. Macroeconomic reforms introduced within the country since 2003 have created an environment for strong and sustained economic growth over the past few years and Nigeria is currently ranked 30th in the world in terms of GDP (purchasing power parity) as at 2011.”

Although the sustained civil democratic governance since 1999, (the longest since independence in 1960) has led to unprecedented economic growth, especially the attraction of foreign direct investment (FDI), there are grey areas posing as new strands of challenges to this growth paradigm.

Chiefly, the recent escalation of security in North and the not so comfortable calm in the oil and gas producing Niger Delta belt is seen as a major threat to this political-economic stability.

The Nigeria telecom industry’s exponential growth since its deregulation is in 2001 has seen its rise to become the leading market in the Africa and Middle East (MEA) region.

With active subscribers in excess of 102 million, and teledensity of over 70 percent, Nigeria no doubts is seen as a fertile market. But despite these, there has been a steady decline in year-on-year growth in the past two eyar, declining ARPUs and a decrease in minutes of usage (MoU) indicate that the telephony market is Nigeria is fast approaching maturity.

However, data services have seen an upward growth in the last decade. The landing on the shores of Lagos of four submarine cables has increased bandwidth intake, thereby making broadband availability even at cheaper cost.

The mobile segment of the telecom industry continues to rule with much the growth coming from the GSM sector, while the CDMA operators lay prostrate.

The fixed line sector is non-existent in this market as there are no new infrastructural investments and operators seem to stay off course.

The USPF however believe, it could fasttrack development in the ICT sector through three strategic planks, viz-a-viz facilitation of an enabling environment for ICT (especially promotion of rollout of sustainable ICT service in rural, un-served and underserved areas), promotion of universal access and universal service that facilitate connectivity for development and Institutional development.
While stakeholders applauded the new USPF approach, they also expressed cautious optimism over the Funds’ ability to keep to its terms of engagement.

Ms. Funke Opeke, CEO of MainOne Cable, West Africa’s first open access submarine cable operator noted that the Fund’s implementation module has not transited to new reality of large the volume of bandwidth available in the country. She believes it could do better if it effectively engages every operator and stakeholder as promised in the new SMP.

Engr. John Ayodele, director of Post and Telecommunications in the Ministry of Communications Technology notes that government was addressing all grey areas that stand as cog in the wheel of ICT growth in the economy.

Amongst such impediments, the issue of right of way (RoW) is getting urgent government attention, he noted.  While admitting that states have rights to legislate on relevant laws to increase revenue base, Ayodele stated all levels of government was discussing to address the issues of RoW and redress the much maligned multiple tax conundrum. 

Titi Omo-Etu, former president of association of telecom operators of Nigeria (ATCON), welcomed the new SMP, but cautioned both operators and the Fund to stay on course to achieve the set goals.

“There appears to be a paradigm shift, because in the past, the USPF has failed to communicate effectively with operators. And this shift also calls for operators to give the Fund the benefit of the doubt so that together, we can all work together to achieve our objective of developing the industry of our dream,” said Omo-Etu.


Kindly share this post

Dear Reader, Your support matters. But we believe that technology makes life more exciting and helps improve the lives of people around Nigeria and indeed the world. That is why, we have devoted our energy to independent reportage of technology and finance and how they affect lives. Our incisive and analytical view of how technology news affects the daily life help individuals and organizations make up their minds. Quality journalism costs money. Today, we're asking that you support us to do more. Kindly support our effort to deliver technology and finance journalism to everyone in the world. Donate as little as N1,000. Bank transfers can be made to: UBA Plc 1017156876 Communication Week Media Ltd

Telecom

MTN Nigeria Crowns Ayo Benzi Winner of Next Afrobeats Star

Published

on

L-R: Onyinye Ikenna-Emeka, Chief Marketing Officer, MTN Nigeria; Ayodeji Benson, Winner, Next Afrobeats Star Reality Show (Season 1) and Emamoke Ogoro, General Manager, Brand and Communication, MTN Nigeria, at the grand finale of the Next Afrobeats Star Reality Show (Season 1), held at the Ultima Studios, Lekki, Lagos on Saturday, December 13, 2025.
Kindly share this post

MTN Nigeria, in collaboration with ONErpm and Ultima Studios, has announced Ayodeji Benson, popularly known as Ayo Benzi, as the winner of the maiden edition of the Next Afrobeats Star reality show.

MTN Nigeria Crowns Ayo Benzi Winner of Next Afrobeats Star

L-R: Onyinye Ikenna-Emeka, Chief Marketing Officer, MTN Nigeria; Ayodeji Benson, Winner, Next Afrobeats Star Reality Show (Season 1) and Emamoke Ogoro, General Manager, Brand and Communication, MTN Nigeria, at the grand finale of the Next Afrobeats Star Reality Show (Season 1), held at the Ultima Studios, Lekki, Lagos on Saturday, December 13, 2025.

The grand finale, held on Sunday night at Ultima Studios in Lekki, Lagos, marked the climax of a nationwide talent search that began in September with over 15,000 aspiring musicians.

After weeks of auditions, mentorship, and rigorous training, five finalists – Ayo Benzi, Dave Cash, Kaeko, Somto O’Laker, and Lucky Yay – battled for the top prize in a high-energy showcase of performance and artistry.

At the end of the electrifying contest, Ayo Benzi emerged victorious, securing a ₦150 million music deal. Dave Cash was named first runner-up with ₦100 million, while Kaeko, Somto O’Laker, and Lucky Yay received ₦75 million, ₦50 million, and ₦25 million respectively.

Throughout the season, contestants were mentored by leading Afrobeats producers Sarz, Puffy Tee, P Prime, and Andre Vibez. Benzi, who was part of Puffy Tee’s team, credited the mentorship programme for sharpening his craft and stage presence.

Speaking at the event, Onyinye Ikenna-Emeka, Chief Marketing Officer of MTN Nigeria, said the initiative reflects the company’s commitment to youth empowerment and cultural expression.

“The Next Afrobeats Star platform is about creating real opportunities for young Nigerians and giving their talent the structure, visibility, and support it deserves.

“Afrobeats continues to place Nigeria on the global cultural map, and MTN is proud to be enabling the next generation of artists who will take this sound even further,” she said.

She added that the finale was not just a competition but a celebration of growth and readiness for the global stage.

In his acceptance speech, Ayo Benzi described the victory as a defining moment in his career.

“A big thank you to MTN. From the audition days, the treatment MTN has given us has been amazing. God bless the brand,” he said.

The finale also featured guest performances by Afrobeats stars Iyanya and Bella Shmurda, adding glamour to the night and reinforcing the show’s connection to the wider music ecosystem.

With the successful conclusion of the season, MTN Nigeria and its partners reaffirmed their role in championing youth ambition, supporting creative industries, and shaping the future of Nigerian music through platforms that turn potential into opportunity.


Kindly share this post
Continue Reading

Telecom

T2 Faces NCC Probe in Benue Over Major Service Outage in 9 LGAs

Published

on

Kindly share this post

T2, formerly known as 9mobile, is under investigation by the Nigerian Communications Commission (NCC) in Benue State for an undisclosed incident disrupting USSD, SMS, voice, and data services across nine local government areas.

T2 Faces NCC Probe in Benue Over Major Service Outage in 9 LGAs

T2

The affected areas include Ado, Agatu, Gwer East, Gwer West, Konshisha, Obi, Ohimini, Okpokwu, and Otukpo, as detailed in an advisory on the NCC Major Outages Portal, which tracks significant disruptions reported by Mobile Network Operators (MNOs) and Internet Service Providers (ISPs).

Neither T2 nor its public relations firm, Chain Reactions, has responded to inquiries on the outage’s cause or restoration efforts as of this report.

The NCC’s continued reference to the operator as 9mobile, months after its public rebranding to T2 in August 2025, has sparked questions about whether the name change was formally notified to the regulator.

This probe aligns with NCC mandates requiring operators to disclose major outages, their impacts, and timelines for fixes, with compensation obligatory for disruptions exceeding 24 hours under the Consumer Code of Practice Regulations.

Industry watchers note that such incidents, often linked to fibre cuts, power failures, or infrastructure faults, underscore ongoing challenges in Nigeria’s telecoms sector, particularly amid T2’s subscriber losses post-rebrand. NCC vows transparency via its portal to hold operators accountable and protect consumers.


Kindly share this post
Continue Reading

Telecom

NCC Unveils Draft 5-Year Spectrum Roadmap, 60 GHz License-Exempt Guidelines to Boost Broadband, Innovation

Published

on

Kindly share this post

Nigerian Communications Commission (NCC) has unveiled two pivotal regulatory draft documents aimed at reshaping Nigeria’s communications sector over the next five years and fast-tracking deployment of ultra-high-speed wireless technologies.

NCC Unveils Draft 5-Year Spectrum Roadmap, 60 GHz License-Exempt Guidelines to Boost Broadband, Innovation

NCC

In a public notice dated December 19, 2025, and issued pursuant to its mandate under the Nigerian Communications Act (NCA) 2003, the Commission published the Draft 5-Year Spectrum Roadmap for the Communications Sector (2025–2030) and Draft Guidelines for the Use of the 60 GHz License-Exempt Band for Multi-Gigabit Wireless Systems.

Both documents are accessible on the NCC website for stakeholder review, with the roadmap outlining strategic spectrum planning, allocation, and management to optimise utilisation, support emerging technologies like 5G and IoT, expand broadband access, and align with global best practices.

The Spectrum Roadmap emphasises four core pillars: bridging the digital divide through low-band spectrum and satellite services, attracting investments via flexible licensing models, enhancing service quality with mid-band optimisation, and fostering innovation in areas such as direct-to-device connectivity and secondary spectrum trading.

It sets ambitious targets including universal 4G coverage nationwide, 50 per cent 5G penetration in state capitals, and average broadband speeds of 100 Mbps by 2030, while addressing rising data demand through band refarming and efficient management.

Complementing this, the 60 GHz Guidelines establish a license-exempt framework for the 57–66 GHz band, enabling multi-gigabit speeds up to 10 Gbps for short-range applications like WiGig, fixed wireless access, enterprise connectivity, urban broadband, and backhaul solutions.

The rules mandate NCC type approval for equipment, site registration for outdoor use, and interference mitigation measures, while prohibiting wide-area networks to safeguard primary users.

In line with Section 58 of the NCA 2003, NCC invites comments from industry operators, equipment manufacturers, consumer groups, and the public, with submissions due by Friday, January 16, 2025, via email to [email protected], [email protected], and [email protected].

The notice, signed by Mrs Nnenna Ukoha, Head of Public Affairs, stresses that stakeholder inputs will refine the frameworks to drive innovation, investment, competition, and sustainable growth in Nigeria’s telecoms ecosystem.


Kindly share this post
Continue Reading

Trending